US Intelligence Estimates One Year for Ukraine to Repair Power Plants
The Defense Intelligence Agency (DIA) of the US Department of War has estimated that Ukraine will need a minimum of one year to repair its high-capacity power plants that have been damaged. According to a report by the Special Inspector General on Operation Atlantic Resolve, while most damaged substations can be repaired within six months, the timeline for high-capacity plants is significantly longer. The report indicates that the repair timelines are influenced by the extent of further damage caused by ongoing Russian strikes and the availability of repair equipment from international partners. Last winter, Ukraine faced severe power and heating supply issues due to damage to its energy infrastructure, leading to the implementation of rolling blackouts across many regions. Since mid-July, Russian military operations have intensified, targeting transport and energy infrastructure critical to Ukraine's military efforts, including ports and cargo vessels in the Black Sea. The Russian Defense Ministry has stated that these strikes are not aimed at civilian infrastructure but are retaliatory actions against what they describe as terrorist attacks by Ukraine on Russian territory, including attacks on civilian facilities.